Success Story

Award winning design

 

 

Case: Swedbank Stadium in Malmö, Sweden

Customer: Ruukki

 

A close cooperation between Citec’s design team, architect and Ruukki’s structural engineers has been vital to ensure the end result. A number of brainstorming sessions and discussions has lead to a cost efficient structure while simultaneously giving the stadium a strong architectural expression.

 

One of the main challenges of modelling Swedbank Arena has been to ensuring the interface between Ruukki’s steel frameworks and supporting concrete structures. Each of the 58 roofs- and wall frameworks sits on anchor bolts in prefabricated concrete structures. To ensure perfect positioning of the steel frameworks, each hole in framework-endplates has been made only after having measured and recorded the exact anchor bolt position.

 

Thou project management and coordination has been done by Citec in Sweden and Finland, the biggest part of the modelling work has been done by Citec in India. With a drawing-delivery divided in seven main batches, and a number of design revision, keeping the Tekla-model up to date has also been one of the main challenges of the project.

 

In this Ruukki project, the Citec scope of work has been:

  • Tekla Structure Steel Design
  • Project Coordination
  • Bill of Quantities
  • Animations

 