Project description
EPC contractor Siemens sub-contracted the piping detail engineering and plant 3D modelling for a 3 x 67.5 MW gas-fired power plant to its approved global vendor Citec.
Citec's scope
Citec delivered the piping system including entire steam water cycle with FW piping up to boiler and steam piping from boiler terminal, turbine auxiliary piping – oil and gland system, main and auxiliary CW piping, drain and vent system, HP bypass system.