Project description
Citec acted as EPCM provider for a 20 MW biomass-fuelled power plant for electricity and heat production in the heat district network at a new site in France.
- 2000 m3 automated wood-handling storage
- 20 MWth biomass boiler
- 6 MWe steam turbine
- Air-cooled condenser
- Demineralized water production and utilities
- Buildings and civil works
- Electrical distribution network
- Control system
Citec's scope
Full EPCM project including:
- Pre-study with site layout, process specification and cost estimations
- Writing of RFQs for different packages
- Selecting suppliers
- Documentation needed for local authorisations
- Basic engineering
- Management of suppliers
- On-site coordination
- Commissioning assistance
- Documentation and training