Project description

Design development of harvester cabin in cooperation with MSK’s design team.

Citec's scope

  • Understanding the modular concept design considering market requirement responsible for the value engineering of the parts.
  • Concept development, 3D modelling of cabin frame, interior and exterior panels, HVAC ducting, roof designing, seat mounting. A and B pillar ducting, doors and seat structure and mounting.
  • Preparation of part assembly and installation drawings and bill of materials.
  • Necessary modifications to enable serial production.

The Citec team included engineers from both Citec Finland and Citec India. At the end of the project, a Citec designer was stationed as consultant at the factory.

Case in brief
Customer: MSK Cabins
Project location: Finland
Year completed: 2017