Project description

As a response to stricter environmental requirements, a liquefied natural gas (LNG) import terminal is built in Röyttä, Tornio. The terminal will make the Finnish gas and fuel markets more versatile and are used by shipping and road transportation companies as well as power and heat utilities. The terminal can also be used for LNG bunkering as well as supplying fuel for LNG-powered ships.

Citec's scope

Citec was involved in several key areas of the LNG project, such as:

  • engineering management
  • layout design
  • interface management
  • 3D model management
  • piping design
  • fire fighting system design
  • civil structures (LNG tank excluded)
  • terminal electrification design
  • quality assurance
Case in brief
Customer: Wärtsilä
Project location: Finland
Year completed: 2017
Technical data:

Terminal main data:

  • Tank net volume: 50 000 m3
  • Ship unloading rate: 3 000 m3/h
  • Send out rate (max): 40 t/h
  • Outlet gas pressure: 6.0 barg
  • LNG in-tank pumps: 3 x 175 m3/h
  • BOG compressors: 3 x 3 000 kg/h