Project description

End customer Tüpras Izmir Refinery suffered badly from a boiler explosion and decided to replace the existing installation with an Aalborg Engineering A/S delivered SteamGenTM8 Heat Recovery Steam Generators (HRSG) with steam data 100 t/h, 41 bar, 445°C.

Citec's scope

Citec provided structural engineering for:

  • boiler support structure
  • boiler support beams (BSB),
  • BSB casing
  • chimney
  • top hat
  • stair tower, stairs, platforms and ladders
  • supports for equipment and pipes

The engineering including all calculations, reports, drawings and 3D models resulted in documentation including:

  • piping flex calculation reports
  • static calculation reports
  • design basis reports
  • general note, workshop drawings and GA drawings.
Case in brief
Customer: Aalborg Engineering A/S
Project location: Turkey
Year completed: 2011